37MW Solar Pile Mounting Project
Located: 1KM from The seaside
Year: 2019
This is our 37MW solar power plant constructed on the beach. The project site is very soft in rainy season and is not suitable for installing solar mounting structure directly, because it is only 1km away from the seaside
SOLAR FIRST R&D department stand for customer side to designed a PILE MOUNTING to support the solar mounting structure.
Advantages: Ensure safe operation of the project, perfect combination of aluminum alloy and carbon steel, truly satisfied with customers’ needs.